This guideline was developed as part of the Department of National Parks, Recreation, Sport and
The Great Barrier Reef report card is part of the Reef Quality Water Protection Plan and measures the progress from 2009 to 2013 regarding the Reef Water Quality Protection plan 2009 targets.
The continuation of the Rubber Vine Control works on Lukin River Containment line has shown a targeted approach which continues to reduce the threat of Rubber Vine extending past the containment line. The areas controlled cover a total area of approx 784 ha with 28 km of River.
This is the final draft for the Normanby Catchment Water Quality Management Plan and was released for consultation and review on the 1st of September 2013.