This plan was released in July 2003 by Environment Australia in consultation with the Marine Turtle Recovery tean. Unlike the other threatened species plans, a limited understanding of turtle populations at the time meant that this plan adopted a threat reduction based approach to turtle consevation.
This plan was released in 2008 and produced by the Australian Government and Queensland Environmental Protection Agency with the intention of protecting and rehabilitating the Mabi rainforest and where possible expanding the rainforest into surrounding areas, reversing already existing damage to the rainforest.
This report was released by several government bodies including the Commonwealth Government with the intention of maintaining populations of the Red Goshawk across Australia and ultimately increasing their population.
This document is the introductory pages for the Northern Peninsula Area Council's 2010-2020 Land and Environment Management Plan released in December 2010. This is a draft document broken into three sections; introduction, an overview of plans, and Land use and Land Management constraints.
With a total shell length of less than 3.2 cm this hatchling painted turtle from the Jardine River catchment is both of ecological interest and just dam cute.
This draft plan was the product of a contract between Wik Projects and the Department of Natural Resources and Water, created on behalf of the Natural Heritage Trust. This report focuses predominately on the experiences and aspirations of Wik, Wik Way, and Kuugu people.
The Great Barrier Reef report card is part of the Reef Quality Water Protection Plan and measures the progress from 2009 to 2013 regarding the Reef Water Quality Protection plan 2009 targets.