Skip to main content

Data Explorer

Filter by:

A painted turtle hatchling brings hope

pdf Case Study

With a total shell length of less than 3.2 cm this hatchling painted turtle from the Jardine River catchment is both of ecological interest and just dam cute.

View


Dunbar Station: Case Study

pdf Case Study

About the program

The goal of this four-year program is to work with participating grazing land managers to develop and implement practical action plans that improve soil stability, native vegetation, and water quality in the Joint Management Area (JMA) of the Mitchell River catchment.

View


Aurukun waterways wetland and coastal draft management plan 2009 (draft)

pdf Planning Document

This draft plan was the product of a contract between Wik Projects and the Department of Natural Resources and Water, created on behalf of the Natural Heritage Trust. This report focuses predominately on the experiences and aspirations of Wik, Wik Way, and Kuugu people.

View